Most corona treater problems that show up a year after purchase were set in motion on the day of purchase. A machine that is slightly too small for the web, a supplier chosen on price alone, an acceptance test that was never defined: each of these seems minor at the time and becomes expensive later.
The good news is that these mistakes follow patterns. Buyers who have been through a poor purchase tend to describe the same issues. This article collects them, explains why they happen, and shows how to avoid them when you work with any corona treatment machine manufacturer.

Mistake 1: Buying on Price Alone
The cheapest quote is tempting, especially when a budget is fixed. But treaters are long-life equipment, and the purchase price is only one part of the total cost.
A low price can hide:
- Lower-grade generators or transformers that run hot or trip often
- Electrodes and roll coverings that wear quickly
- Limited documentation and training
- Slow or unavailable spare parts
- Weak support when a fault stops your line
How to avoid it: Compare proposals on total cost over several years. Include energy use, expected wear parts, downtime risk and support, not just the equipment price.
Mistake 2: Giving the Supplier Too Little Information
A request that says only "corona treater, 1,000 mm" invites a generic answer. The supplier has to guess your materials, speeds, space limits and site conditions.
How to avoid it: Share the details that shape the design: film types and thicknesses, minimum and maximum web width, line speed, treatment side, mounting position, available power and ventilation. If you are fitting to an existing machine, send photos and drawings. A supplier who asks follow-up questions is doing the job properly.
Mistake 3: Sizing for Today Only
Many buyers specify exactly what they run now. Then a new customer arrives wanting a wider film, or the press is upgraded to a higher speed, and the treater no longer keeps up.
How to avoid it: Think about the next three to five years. If you may run wider webs, faster speeds or tougher films, mention it. A modest allowance in generator capacity is usually far cheaper than replacing a system later. Avoid the opposite error too: heavy oversizing wastes money and can encourage over-treatment.
Mistake 4: Believing "More Power Fixes Everything"
A common myth is that a bigger generator solves all treatment problems. Power matters, but it is only one variable.
Uneven treatment can come from an uneven gap, a worn electrode, a damaged roll covering, contamination or a poor speed signal. Raising power in these cases can increase wear, waste energy and create over-treatment, such as blocking on the reel, without curing the root cause.
How to avoid it: Ask suppliers how they achieve uniform discharge across the width, not just how many kilowatts the generator delivers. Check mechanical build, gap adjustment and electrode quality as carefully as the electrical rating.
Also Visit: Ceramic electrodes for corona treatment
Mistake 5: Ignoring Site Conditions
A treater has to live in your plant, not in a showroom. Heat, dust, humidity and unstable power all affect performance and life.
How to avoid it: Tell the supplier about your environment up front. Ask what temperature range the equipment is designed for, how it copes with dust and moisture, how it handles voltage variations and what protective features are included. A supplier with experience in similar conditions can offer practical advice.
Mistake 6: Overlooking Ozone Extraction and Safety
Corona discharge produces ozone and operates at high voltage. Some buyers treat extraction and safety features as optional extras, then discover problems at installation or during a safety audit.
How to avoid it: Ask what extraction is supplied, how it should be ducted, and whether the generator can be interlocked with it. Check guarding, grounding, emergency stop integration and documentation. Make sure the equipment meets the electrical and safety requirements that apply where you operate, and involve your own safety adviser early.
Mistake 7: Skipping the Acceptance Criteria
Many disputes begin with a simple question: "Does it work?" If the answer was never defined, the buyer and supplier may disagree.
How to avoid it: Agree acceptance criteria before ordering. For example, state the films, line speeds and widths to be tested, the target surface energy, the method of measurement and the number of test points across the web. Write this into the order and carry out the tests at commissioning.
Mistake 8: Neglecting Training and Documentation
Even good equipment can be misused. Operators who do not understand treatment may set power by feel, ignore warning signs or clean electrodes incorrectly.
How to avoid it: Ask what training is included, for whom, and in what format. Request manuals, wiring diagrams, parts lists and maintenance schedules in a language your team can use. Keep them where people can find them.
Mistake 9: Forgetting About Spares and Support
A treater that sits idle waiting for a part costs far more than the part. Some buyers only discover how slow support is when something breaks.
How to avoid it: Before ordering, ask which spares you should hold, how quickly others can be supplied and how to reach technical support. Hold a spare electrode for critical lines, and confirm warranty terms in writing.
Mistake 10: Assuming Treatment Lasts Forever
Some buyers assume that once a film is treated, it stays treated. In reality, treatment can fade over time, especially with certain additives, humid storage or long delays before printing.
How to avoid it: Treat as close to the point of use as practical, test at the start of each job, and store film in clean, cool, dry conditions. Choose a treater position and control system that support this approach.
Myths That Lead Buyers Astray
"All treaters are basically the same." Build quality, discharge uniformity, controls and support vary widely between suppliers.
"A higher treatment level is always better." Over-treatment can cause blocking, odour and sealing problems. Aim for the level your process needs, with a margin for decay.
"Pre-treated film means I do not need a treater." Pre-treated film can lose its level in storage. In-line treatment is a safeguard.
"Maintenance can wait until something breaks." Cleaning, inspection and gap checks cost little compared with failures during production.
"Once installed, it is set and forget." Settings should be recorded and adjusted for each material, speed and width, and checked regularly with surface energy tests.
A Short Pre-Order Checklist
Before signing, make sure you can answer yes to these questions:
- Have I given the supplier complete information about materials, width, speed, space and site conditions?
- Have I asked for technical details of the generator, transformer, electrodes, rolls and controls?
- Does the design allow for reasonable future growth?
- Are ozone extraction, guarding and safety interlocks included and clearly described?
- Are acceptance criteria and test methods agreed in writing?
- Is training and documentation part of the offer?
- Do I know which spares to hold and how fast support responds?
- Have I compared total cost, not only purchase price?
- Have I asked for references from similar applications?
- Are warranty terms clear and acceptable?
Final Thoughts
Most buying mistakes come from rushing, assuming or under-specifying, not from bad luck. A little preparation, clear communication and healthy scepticism toward easy answers go a long way.
When you evaluate a corona treatment machine manufacturer, look beyond the price and the headline power rating. Check whether the supplier understands your process, explains its design choices, supports you through installation and training, and stays available afterward. Agree how performance will be measured, plan for growth and safety, and keep up good habits once the machine is running. These steps protect your budget, your print quality and your production schedule for years to come.