Maxwell GeoSystems’ MissionOS offers its Clients a custom web GIS user interface.

Custom Web GIS Interface In Plan

Maxwell GeoSystems' own mapping solution gives users a solution focused on infrastructure management

Simple mapping interface with no middle ware

Register hazards & sensitive structures to the system by digitising them

Organised data tabs for instrumentation and construction detail

Interactive zoom and pan

Construction progress data

Built in alarms and blogs make communication easy

Flexible graphing and reporting

Construction progress data

Viewable in Google Earth

3D viewing in SketchUp

Show TBM and other construction parameters on the map

Download your data to Excel at any time

Custom GIS In Section

Flexibility to Design any Interface According to Clients Needs not Middleware Capability

Plan – Easting, Northing

Section – Chainage and Reduced Level

Schematic long section – dX in m along the control line relative to the cutterhead chainage, dY in m above and below the control line

Schematic – cross section – dX left and right of the control line (looking down tunnel in direction of mining)

Simple Yet Powerful Tools

Designed by our clients to suit their needs. Get the benefits of years of customer feedback and involvement

Draw interactive section lines through your data

Results combine instruments, works progress, boreholes, affected structure and interpreted contour surfaces on one interactive plot

View Design Plans and Compare with Contours

Drill down to the full AGS data and analyse in real time

Change Map

Use Mapping to Highlight Key Areas of Concern and Assess Change and Spatial Correlation

Using the fadeout option users can determine whether old data should be visible or whether it should fade away over time. After time N it will no longer be included in any plots.

Using the change maps option the user can display instruments either issuing alarms over a period or change as % of alarm over a period. Construction can also be displayed in the same way so that cause and effect can be displayed.

The status of instruments on any day can be re-displayed and compared with the current situation

Service: construction progress data