Low Voltage Switchgear: Avoiding Overcrowded Cable Compartments
Contractors face a familiar challenge on site. They receive low voltage switchgear built to a standard footprint. Then the actual cable schedule arrives. The volume of incoming and outgoing cables exceeds the space the designer allowed. What follows is a scramble to force terminations into a compartment that cannot properly hold them.



Sign in to leave a comment.