In the field of wind turbines, hybrid towers far surpass steel towers in terms of height, adaptability, and safety. Concrete towers are the future solution to save costs and increase power generation efficiency for renewable energy projects such as power station using wind energy. As one of the leading direct drive wind turbine manufacturers , we provide concrete towers range in height from 120 meters to 300 meters and accommodating mainstream models from 2MW to 20MW, achieving a comprehensive geographical layout from land to sea and from plains to mountains. Cumulatively, different types of turbine have been equipped in wind farms worldwide with a total capacity of 5000MW.
Different Types of Wind Turbines
HH180 Hybrid Tower
Fengling's concrete wind turbine tower reaches a height of 180 meters, with the concrete section standing at 157.4 meters. Compared to shorter towers, this taller structure significantly overcomes...
Advantages of Concrete Towers
1
Enhanced Durability
Constructed from materials with superior durability, concrete towers are capable of withstanding harsh weather conditions and chemical corrosion, thereby extending their service life.
2
Cost-Efficiency
Concrete towers are more economical in both production and maintenance, particularly for taller structures and large-scale wind farms, leading to substantial cost savings.
3
Exceptional Vibration Dampening
With excellent vibration dampening capabilities, concrete towers effectively absorb and disperse external forces from wind and seismic activities, ensuring stable operation of wind turbines.
4
Reduced Maintenance
Compared to steel towers, concrete towers demand less maintenance, leading to lower long-term operational costs and reduced downtime.
Concrete Tower Wind Turbine Assembly Process
Advanced modular and mobile production methods of the power generating turbine enable us to achieve the same high-quality level anywhere in the country and quickly build up considerable capacity. As one of the direct drive wind turbine tower manufacturers, we provide on-site production, which avoids costly long-distance transportation and heavy transportation, further saving costs.
Foundation Engineering
Tower Piece Manufacturing
Interior Trim
Tower LIfting
Prestressing
Turbine Hosting
Worldwide Layout
01 Set-up
The layout of the energy turbine production base needs only 60 days to be built and put into production. The production capacity of each standard base can reach 180 sets/year.
02 Mobile
Modular installation and disassembly of the tower turbine such as the hydraulic wind tower will allow us to achieve rapid production and efficient delivery around the world.
There are many Chinese wind turbine manufacturers, but we are one of the best choices for you.