Disclaimer: This is a user generated content submitted by a member of the WriteUpCafe Community. The views and writings here reflect that of the author and not of WriteUpCafe. If you have any complaints regarding this post kindly report it to us.

 

 

Introduction

 

The primary objective of BIM is to coordinate and collaborate various design models into one single model. The success of any construction project depends on the effective coordination between the stakeholders associated with the project. The detection and solution of clashes in BIM is an essential part of any construction project.

What is clash detection in BIM?

Clash detection is a crucial part of the integrated BIM process. The BIM creates a comprehensive model that includes multiple design models. Traditionally, the clash detection process was usually performed on the construction site. But in the present time, it takes place during the pre-construction stage. It allows the construction-related issues to get solved before the actual construction begins. 

 

At Krishna OS you will get the best BIM Clash Detection Services for your project. It will save you a lot of time, money, and manpower during construction.

 

Significant benefits of clash detection in BIM

 

1. Accurately made documentation for engineering designs

 

BIM clash detection allows project owners, architects, and engineers to develop complicated designs. They can create these designs without worrying about the quality of construction documents. The advanced features of clash detection enable a change made to a single element to reflect in all views automatically. It also fastens the information transfer and increases efficiency.

 

2. Reduce iterations during the construction phase

 

BIM allows the planning, arrangement, and visualization during the designing stage of the project. Thus, the chances of changes during the construction stage are significantly eliminated. Here, all the information about the project is gathered in the form of a 3D model. It ensures the easy distinction of clashes during the initial pre-construction stages. 

 

3. Improvement in coordination & cooperation between teams 

 

The digitalized workflow makes coordination & collaboration easier among teams. BIM & clash detection software like Navisworks ensures rapid knowledge transfer for efficient coordination. It will simplify, accelerate, and streamline the construction process.

 

4. Automatic process for clash & conflict resolution

 

The contemporary BIM toolkit automates the multi-element clash detection process. However, BIM allows architects & engineers to model everything in advance. It will minimize the on-site conflicts. Because all the elements of the project perfectly fit together despite being manufactured off-site. 

 

5. Streamlined & unified approach

 

Central BIM modeling strategy is a very important aspect of the construction project. Without a BIM modeling strategy, it is difficult for architects to get a universal view of the project. Unconnected documents make it challenging for a team to visualize the correct amount of creativity for the project. BIM clash detection software increases transparency and effectiveness at a great level. It allows effective cooperation with other project stakeholders.

 

Conclusion

 

BIM clash detection technology has significantly transferred the field of engineering design. This technology has made it simple to foresee, analyze, and eliminate clashes in the pre-construction stages. Thus, the work of architects and engineers turns simple due to the BIM and clash detection. 

 

If you are interested in taking maximum advantage of BIM tools & clash detection, then take help from Krishna Outsourcing. We are one of the best BIM Consulting Services in India. At Krishna Outsourcing, we also provide Mechanical Shop Drawing Services. Contact us at +91 8460 220 396 or +1845 445 4108 to get more details about our services.

 

0